Task # |
Description |
Date |
|
Co-op # DE-FC28-04RW12232 |
|

|
ORD-FY04-001 |
NSHE/YMP Nuclear Waste Coop Agreement FY-2006 Administrative Audit
Rpt: Audit No. AA-06-01
|
Sep 2006
|
|
2007 NSHE/YMP Cooperative
Agreement Technical Progress Briefings - Las Vegas session |
11 Jan 2007 |
|
2007 NSHE/YMP Cooperative Agreement Technical Progress Briefings -
Reno session |
18 Jan 2007 |
|
 |
ORD-FY04-002 |
FINAL
REPORT: Project Activity Task ORD-FY04-002, Nevada System of Higher
Education Quality Assurance Program |
07 Mar 2008 |
|

|
ORD-FY04-003 |
A
geodetic investigation of ground deformation at Yucca Mountain, southern
Nevada
|
Aug 2005
|
|
Briefing:
Geodetic Monitoring of the Yucca Mountain Region Using Continuous GPS
Measurements |
18 Jan 2007 |
|

|
ORD-FY04-005 |
Briefing: Ground
Water Level Monitoring at Yucca Mountain: A Programmatic Summary |
11 Jan 2007 |
|

|
ORD-FY04-006 |
Briefing: Southern
Great Basin Seismic Network Operations
(Note: for security reasons, network configuration
information contained in the original version of this presentation has been removed from this
web posting) |
18 Jan 2007 |
|

|
ORD-FY04-007 |
Briefing:
Precipitation Monitoring at Yucca Mountain |
11 Jan 2007 |
|
 |
ORD-FY04-008 |
Briefing: Longbase Laser
Strainmeter Measurements at Yucca Mountain |
18 Jan 2007 |
|

|
ORD-FY04-010 |
Briefing: Chemical
Analyses in Support of Yucca Mountain Studies |
11 Jan 2007 |
|

|
ORD-FY04-012 |
Briefing: Yucca
Mountain Climate: Past, Present, and Future |
18 Jan 2007 |
|

|
ORD-FY04-013 |
Briefing: Influence of Lithophysae Geometry on Mechanical Properties of Hydro-Stone® |
11 Jan 2007 |
|

|
ORD-FY04-014 |
The
effect of temperature oscillation on the passive corrosion properties of
Alloy 22 (external link) |
28 Nov 2006 |
|
Briefing: Environmental Effects on Corrosion Properties of Alloy 22 |
18 Jan 2007 |
|
Final Technical Report: Environmental Effects on Corrosion Properties
of Alloy 22 |
30 Sep 2008 |
|

|
ORD-FY04-015 |
Briefing: ORD-FY04-015: Phase Stability and Segregation in Alloy 22 Base Metal and Weldments |
18 Jan 2007 |
|

|
ORD-FY04-016 |
Briefing: Geostatistical and
Stochastic Study of Radionuclide Transport in the Unsaturated Zone at Yucca
Mountain |
11 Jan 2007 |
|

|
ORD-FY04-017 |
Briefing:
Yucca Mountain Saturated
Zone Carbon-14 |
8 Jan 2007
|
|
FINAL REPORT: Yucca Mountain Area
Saturated Zone Dissolved Organic Carbon Isotopic Data |
25 June 2007 |

 |
ORD-FY04-019 |
Sub-surface Corrosion Research on Rock Bolt System, Perforated SS Sheets and
Steel" quarterly technical progress summary 7-01-04 to 9-31-04 |
07 Oct 2004 |
|
Sub-surface Corrosion Research on Rock Bolt System, Perforated SS Sheets and
Steel Sets for the Yucca Mountain Repository: Quarterly Technical Progress
Report No. 2 |
04 Jan 2005 |
|
Sub-surface Corrosion Research on Rock Bolt System, Perforated SS Sheets and
Steel Sets for the Yucca Mountain Repository: Quarterly Technical Progress
Report No. 3 |
08 Apr 2005 |
|
Sub-surface Corrosion Research on Rock Bolt System, Perforated SS Sheets and
Steel Sets for the Yucca Mountain Repository: Quarterly Technical
Progress Report No. 4 |
07 Jul 2005 |
|
Sub-surface Corrosion Research on Rock Bolt System, Perforated SS Sheets and
Steel Sets for the Yucca Mountain Repository: Quarterly Technical
Progress Report No. 5 |
07 Oct 2005 |
|
Sub-surface Corrosion Research on Rock Bolt System, Perforated SS Sheets and
Steel Sets for the Yucca Mountain Repository: Quarterly Technical
Progress Report No.
6 |
05 Jan 2006 |
|
Sub-surface Corrosion Research on Rock Bolt System, Perforated SS Sheets and
Steel Sets for the Yucca Mountain Repository, Quarterly Technical Report No.
7 |
|
|
Sub-surface Corrosion Research on Rock Bolt System, Perforated SS Sheets and
Steel Sets for the Yucca Mountain Repository, Quarterly Technical Report No.
8 |
30 Jun 2006 |
|
Sub-surface Corrosion Research on Rock Bolt System, Perforated SS Sheets and
Steel Sets for the Yucca Mountain Repository, Quarterly Technical Report No.
9 |
30 Sep 2006 |
|
Sub-surface Corrosion Research on Rock Bolt System, Perforated SS Sheets and
Steel Sets for the Yucca Mountain Repository, Quarterly Technical Report No.
10 |
07 Jan 2007 |
|
Briefing:
Sub-surface Corrosion research on Rock Bolt system, Perforated SS Sheets and
Steel Sets for Yucca Mountain Repository |
18 Jan 2007 |
|
Sub-surface Corrosion Research on Rock Bolt System, Perforated SS Sheets and
Steel Sets for the Yucca Mountain Repository, Quarterly Technical Report No.
11 |
06 Apr 2007 |
|
Sub-surface Corrosion Research on Rock Bolt System, Perforated SS Sheets and
Steel Sets for the Yucca Mountain Repository, Quarterly Technical Report No.
12 |
30 June 2007 |
|
Sub-surface Corrosion Research on Rock Bolt System, Perforated SS Sheets and
Steel Sets for the Yucca Mountain Repository, Quarterly Technical Report No.
13 |
10 Oct 2007 |
|
Sub-surface Corrosion Research on Rock Bolt System, Perforated SS Sheets and
Steel Sets for the Yucca Mountain Repository, Quarterly Technical
Report No. 14 |
10 Jan 2008 |
|
 |
ORD-FY04-021 |
Preliminary results
for indirect tensile strength (“Brazilian”) tests and triaxial tests at
confining pressures of 5, 10, and 20 MPa.
(MS Word format) |
30 Sep 2005 |
|
Final Report: Long-Term Mechanical Behavior of Yucca Mountain Tuff and its
Variability |
March 2006 |
|

|
ORD-FY06-022 |
Briefing: Extreme
Ground Motion Studies |
18 Jan 2007 |
|
Final Technical Report Part B (from subtask 2):
"Exceptional Ground Accelerations and Velocities Caused by Earthquakes"
TR-NQ-022-2 |
17 Jan 2008 |
|
 |
ORD-FY06-023 |
Final Report:
Second generation waste package design study |
28 June 2007 |
|
Co-op # DE-FC28-98NV12081 |
|
 |
1 |
Geodetic Monitoring of the Yucca Mountain Region Using Continuous Global
Positioning System Measurements |
30 Sep 2003 |
|
 |
3 |
Quality Assurance Program
Progress for the Period: Entire Cooperative Agreement DE-FC28-98NV12081 (10/01/98 thru
9/30/03) |
30 Sep 2003 |
|
|
4 |
Fluid
Inclusion Studies (Requires PDF enabled web browser) |
24 Dec 2001 |
|
 |
5 |
Current Document Index System for Document Retrieval Investigation |
Sep 2003 |
 |
10 |
SUPPORT TO THE REGIONAL MODEL |
03 Oct 2003 |
 |
11 |
Final Report for Task 11 |
11 Nov 2003 |
 |
12 |
Southern Great Basin Seismic Network Operations |
07 Oct 2003 |
 |
16 |
FINAL REPORT TASK 16 – Archaeological Studies |
Jan 2004 |
 |
18 |
Experimental Investigation of Time Dependent Behavior of Welded Topopah
Spring Tuff |
Aug 2004 |
 |
19 |
Thermal Transport Evaluations Related to Waste Package Design - Model
Evaluations |
22 Sep 2003 |
 |
20 |
Yucca Mountain Ventilation Studies Support and Associated Code Enhancements |
29 Mar 2002 |
 |
25 |
Semi-analytical
Stochastic Study of Radionuclide Transport in the Saturated Zone Below
Yucca Mountain (TR-2-009.pdf) |
10 Jan 2003 |
 |
26 |
SCIENTIFIC AND ENGINEERING STUDIES OF SYSTEMS, STRUCTURES, AND COMPONENTS
IMPORTANT TO SAFETY FOR A POTENTIAL REPOSITORY AT YUCCA MOUNTAIN, NEVADA:
TASK 26: Upgrade of Earthquake Simulation Facilities in the Large-Scale
Structures Laboratory at University of Nevada Reno |
30 Sep 2002 |
 |
36 |
Remote Monitoring of Repository
Integrity using Passive Seismic Arrays |
30 Sep 2003 |
 |
37 |
The Economic Impact of the Yucca Mountain Nuclear Waste Repository on the
Economy of Nevada |
29 Sep 2003 |
 |
38 |
ORGANIZATION OF THE DEVILS HOLE WORKSHOP |
23 June 2003 |